Back
Construction of wastewater treatment facilities in Simnas town.
Client:
UAB „HIDRUS“
Place:
Simnas
This project includes the construction of self-flowing domestic wastewater, water supply and pressurized wastewater networks (approximately 2532 m), a domestic wastewater treatment plant (capacity 200 m3/d), a wastewater pumping station. The heating, ventilation and air conditioning part of the buildings has been installed, and an asphalt access road and parking lot have been installed.
Other projects
All projects
Contact us