Back
Construction of Stormwater Collection and Treatment Facilities at Lake Dailidė (Basin No. 1)
Client:
UAB “Dzūkijos vandenys”
Place:
Alytus
The project involved the design and construction of 547 meters of stormwater and drainage networks, along with two oil separators (capacity: 240 l/s). A forebay with a volume of 2,100 m³ and a water depth of 2.5 meters was built, as well as a main retention pond with a volume of 10,170 m³.
Other projects
All projects
Contact us